"How much per CBM?" is the first question every LCL shipper asks. The ocean rate per cubic metre, though, is often less than half of what a door-to-door LCL DDP shipment to the USA really costs. This article shows how a complete price is built, so you can compare quotes line by line.
Step 1: Work out the chargeable volume (W/M)
LCL is charged on weight or measurement (W/M), whichever is higher, with 1 m³ = 1,000 kg.
- 3.2 m³ weighing 900 kg → charged as 3.2 W/M (volume is higher).
- 2.0 m³ weighing 2,600 kg → charged as 2.6 W/M (weight is higher).
Most consolidators apply a minimum of 1 W/M. Volumes are re-measured at the CFS, so pallet height and overhang count.
Two variations matter on the US trade. Some carriers price US-bound LCL per revenue ton (RT) of 1 m³ or 300 kg, and Los Angeles CFS warehouses bill per m³ or 800 lb (about 363 kg). Dense cargo such as tiles, metal parts or liquids can therefore be charged on weight in the US even when it is charged on volume in Vietnam.
Step 2: The cost lines in an LCL DDP quote
| Cost line | How it is charged | Who pays under DDP |
|---|---|---|
| Pickup and export clearance (Vietnam) | Per trip / per declaration | Seller |
| Origin CFS charges | Per W/M, often with a minimum | Seller |
| Ocean freight | Per W/M, plus surcharges such as bunker and peak season | Seller |
| ISF filing | Per house bill of lading | Seller (as importer side) |
| Destination CFS / devanning | Per W/M, with a minimum per shipment | Seller |
| Customs entry and bond | Per entry; foreign IORs normally need a single-transaction bond for each entry | Seller / IOR |
| Duties and tariffs | % of customs value, by HTS code and origin | Seller / IOR |
| MPF | 0.3464% of value; minimum US$34.58, maximum US$670.86 per formal entry (from 1 Oct 2026) | Seller / IOR |
| HMF | 0.125% of value (ocean only) | Seller / IOR |
| Final delivery | LTL by weight, freight class and distance; parcel by carton | Seller |
| Accessorials | Liftgate, residential, appointment, storage beyond free time | As agreed — define in the quote |
Surcharges on the ocean leg are explained in ocean freight surcharges.
Step 3: Indicative LCL rates, Ho Chi Minh City → Los Angeles (late 2026)
These are typical figures from our recent LCL quotes to Los Angeles / Long Beach. They move with the market, the carrier and the co-loader, so use them to sanity-check a quote, not as a price list.
| Charge | Typical rate (US$) | Basis |
|---|---|---|
| Origin – Vietnam | ||
| Pickup and export clearance (HCMC area) | about 160 | per shipment |
| THC | 7 | per m³ |
| Origin CFS | 10 | per m³ |
| DDC or EBS, depending on the carrier | 3–28 | per m³ |
| B/L fee and AMS filing | 20 + 10 | per house B/L |
| Ocean freight | ||
| HCMC (Cat Lai / Cai Mep) → Los Angeles / Long Beach | about 150 (express services cost more) | per m³ / RT |
| Los Angeles port | ||
| Pier pass, clean truck, chassis, split chassis, port handling | about 19 in total (4 + 2 + 6 + 3 + 4) | per W/M, small minimums |
| D/O or document transfer fee | 60 | per house B/L |
| Los Angeles CFS warehouse | ||
| Forklift / loading | 6, minimum 60 | per m³ or 800 lb |
| Fuel surcharge | 3, minimum 20 | per m³ or 800 lb |
| Labour and transportation | 13 | per m³ or 800 lb |
| Facility window fee | 125 | per house B/L |
| Documentation / I.T. fee | 10 | per house B/L |
| US customs and delivery | ||
| ISF filing | 25 | per shipment |
| Customs entry | 115 | per entry |
| LTL delivery from the LA CFS (Southern California or Arizona) | from about 500 | per shipment, no liftgate |
Not included: duties and fees, the customs bond, exam fees, demurrage or storage, LCL congestion surcharges (applied case by case), an overweight surcharge on house bills over 20 m³ or 9,071 kg, liftgate and appointment fees, and 8% Vietnamese VAT on origin services. Port-to-port transit is about 17–20 days.
Step 4: A worked example
This example uses the indicative rates above. It is not an offer; ask for a current quote for your cargo.
Shipment: 4 pallets of homewares, 4.0 m³, 1,100 kg, customs value US$12,000, from a factory near Ho Chi Minh City to a commercial warehouse with a loading dock in Southern California. Assumed total duty rate: 20%.
| Line | Basis | Example (US$) |
|---|---|---|
| Pickup and export clearance | Per shipment | 160.00 |
| Origin THC, CFS and DDC | (7 + 10 + 28.10) × 4.0 m³ | 180.40 |
| B/L fee and AMS | Per house B/L | 30.00 |
| Ocean freight | 150 × 4.0 m³ | 600.00 |
| Los Angeles port charges | 19 × 4.0 W/M | 76.00 |
| D/O fee | Per house B/L | 60.00 |
| LA CFS warehouse | Forklift 60 (minimum) + fuel 20 (minimum) + labour 13 × 4 + facility 125 + doc 10 | 267.00 |
| ISF and customs entry | 25 + 115 | 140.00 |
| LTL delivery to a dock | Per shipment | 500.00 |
| Logistics subtotal | About US$503 per m³ | 2,013.40 |
| Duty | 20% × 12,000 | 2,400.00 |
| MPF | 0.3464% × 12,000 = 41.57 (above the 34.58 minimum) | 41.57 |
| HMF | 0.125% × 12,000 | 15.00 |
| Total DDP | Excluding bond, VAT and accessorials | 4,469.97 |
Three lessons from this example:
- Ocean freight is a small part of the cost. The "price per CBM" most shippers compare is US$600 of a US$4,470 landed cost.
- Duty is often the largest single cost. Check the HTS code and origin before you quote a DDP price; see US tariffs in 2026.
- Per-shipment costs do not shrink with volume. Pickup, the CFS minimums and facility fee, the D/O, the entry and the delivery add up quickly. On the same route, a 1 m³ shipment costs about US$1,330 in logistics alone, more than 2.5 times the per-m³ cost of the 4 m³ shipment.
How to lower the cost per unit
- Ship fewer, larger lots. Combining two 2 m³ shipments into one 4 m³ shipment halves the per-shipment fees.
- Optimise the pallet. Avoid overhang and half-empty top layers; you pay for the air.
- Check the break-even with FCL. Around 13–15 m³, a 20' container may cost less — see FCL vs LCL.
- Deliver to a dock. Commercial addresses with a loading dock avoid liftgate and residential fees.
- Get the duty right. The correct HTS code and valid origin documents protect you from both overpaying and penalties.
How to compare two LCL DDP quotes
- Is the price per W/M with a clear minimum, or a lump sum?
- Are duties included at a stated rate, or "at cost"?
- Who is the importer of record, and is the bond included?
- Which destination CFS and delivery fees are included, and which are "if applicable"?
- What happens if CBP orders an exam? See LCL customs clearance.
For a full DDP checklist, see 12 points to confirm in a DDP quote and how DDP pricing works.
Frequently asked questions
How much does LCL shipping from Vietnam to the USA cost per CBM?
Ocean freight from Ho Chi Minh City to Los Angeles is around US$150 per m³ in late 2026. Door to door, with origin and US charges, customs entry and delivery, a 4 m³ shipment costs about US$500 per m³ before duties. A 1 m³ shipment costs much more per m³ because of the fixed per-shipment fees.
Is LCL priced per CBM or per kg?
Per W/M: whichever is higher of cubic metres and tonnes (1 m³ = 1,000 kg) in Vietnam. On the US side, some carriers use 1 m³ or 300 kg, and LA warehouses use 1 m³ or 800 lb.
Why is my LCL invoice higher than the quote?
Usually because the CFS re-measured the cargo at a larger volume, or because destination fees such as storage, liftgate or exam costs were not included in the original quote.
Does DDP cost more than DAP for LCL?
The freight is the same; DDP adds duties, entry, bond and fees to the seller's price. The buyer pays those separately under DAP.
