"China+1" means keeping China in the supply chain while adding production in another country — most often Vietnam, and increasingly Cambodia. For the shift in trade volumes and carrier networks, see China+1 and Vietnam: what the sourcing shift means. This guide is for the companies doing the moving: Chinese, Taiwanese, Korean and Western manufacturers opening or expanding plants, and the brands that buy from them.
Vietnam, Cambodia or both?
| Vietnam | Cambodia | |
|---|---|---|
| Typical China+1 role | Electronics, furniture, steel and aluminium products, machinery parts, footwear, garments | Garments, footwear, bags, bicycles, solar and light assembly in SEZs |
| Ports and shipping | Deep-sea ports at Cai Mep, Cat Lai and Hai Phong with direct US services | Sihanoukville and Phnom Penh; much cargo routes through Vietnamese ports |
| Inputs from China | By sea to HCMC or Hai Phong; ACFTA Form E can reduce duty | By sea direct, or via Vietnamese ports as transit cargo |
| Key trade terms | CPTPP, EVFTA and RCEP for many markets; no FTA with the US | Least-developed-country preferences in some markets; RCEP; no FTA with the US |
| Main logistics watch-out | Peak-season space, inland trucking around HCMC | Fewer direct services; transit and border procedures |
Many groups use both: component or fabric processing in Vietnam, labour-intensive assembly in a Cambodian special economic zone (SEZ), and export through Vietnamese deep-sea ports. That model only works with reliable Vietnam–Cambodia cross-border logistics.
The four logistics flows of a China+1 plant
| Flow | Typical cargo | Customs points | Main risk |
|---|---|---|---|
| 1. Setup | Production lines, moulds, tools, racking, spare parts | Fixed-asset duty exemption lists, used-machinery rules, oversized cargo permits | Machines held at port; damage on heavy lifts |
| 2. Inputs | Fabric, trims, components, resin, steel coil, aluminium billet, packaging | Form E, duty exemption for export production, bonded storage, transit to Cambodia | Line stoppage from late inputs |
| 3. Regional | Semi-finished goods and materials between Vietnam and Cambodia | Moc Bai–Bavet border, Form D (ATIGA), transit declarations | Border delays; documents not matching cargo |
| 4. Outbound | Finished goods to the US, Canada and other markets | Export declaration, C/O, ISF, US entry, importer of record | Origin challenges; buyer delivery penalties |
Phase 1: Moving machinery and equipment
- Duty incentives. In Vietnam, investment projects can import machinery forming their fixed assets duty-free once the list is registered with customs. In Cambodia, a Qualified Investment Project (QIP) can import production equipment and construction materials with duty exemptions. Get the list or approval in place before the machines ship.
- Used machinery. Vietnam generally only accepts used machinery no older than 10 years (Decision 18/2019/QĐ-TTg), with an inspection certificate. Check before you dismantle a line in China.
- Heavy and oversized cargo. Flat racks and open tops, lifting plans, route surveys and permits — including road moves from Vietnamese ports to Cambodian SEZs (see transit cargo from Cat Lai and Cai Mep to Cambodia).
- Timing. Plan the machinery move against the factory handover date; storage and demurrage on idle machines add up fast.
Phase 2: Inputs from China and the region
Most new plants still buy a large share of materials from China in the first years. Three tools keep that affordable and compliant:
- Form E (ASEAN–China FTA). Chinese suppliers issue Form E so qualifying inputs enter Vietnam or Cambodia at preferential rates.
- Duty exemption for export production. Vietnam exempts import duty on materials used to make exported goods, under the export-production or processing regimes, provided consumption norms are declared and reconciled. Plants in Cambodian SEZs and QIPs have comparable exemptions.
- Bonded storage and transit. Cambodia-bound inputs can land at Cat Lai or Cai Mep and move in bond by truck to the SEZ — see transit cargo to Cambodia via Vietnam. Bonded warehouses also help stage inputs close to the line — see the bonded warehouse guide.
Keep the purchase, import and consumption records for every input: they feed both duty reconciliation and the origin calculation in phase 4.
Phase 3: Cross-border flows between Vietnam and Cambodia
Split production between the two countries and the road between them becomes part of your production line. Trucks run daily between Ho Chi Minh City, Binh Duong, Dong Nai and Phnom Penh, Bavet and the other SEZs through the Moc Bai–Bavet border gate.
- FTL or LTL depending on volume; sealed trucks for bonded or transit cargo.
- Form D (ATIGA) for goods of ASEAN origin moving between the two countries, so the importer pays preferential duty.
- Clearance on both sides in one handover — see Moc Bai–Bavet border procedures.
- SEZ exports via Vietnam: finished goods from Bavet often truck to Cat Lai or Cai Mep for direct US sailings — see Bavet SEZ factories exporting via Vietnamese ports.
Our services: Vietnam → Cambodia trucking and logistics for Cambodian SEZs.
Phase 4: Getting finished goods to buyers — DDP to the USA and Canada
US and Canadian buyers increasingly ask China+1 suppliers to quote DDP: one price to their door, duties paid. To do that the factory needs an importer of record in the destination country, a customs broker and a freight plan that fits the buyer's delivery windows.
| Destination | What you need | Our guides |
|---|---|---|
| USA | Non-resident importer of record, bond and US broker, ISF, correct HTS and origin | Importer of record service · DDP to the USA · DDP from Cambodia |
| Canada | Non-resident importer, CARM registration; CPTPP for Vietnamese goods, LDC preferences for Cambodian goods | DDP to Canada · shipping to Canada |
| Other markets | FCL or LCL with the right preferential certificate (for example EVFTA or RCEP) | Sea freight |
To price a DDP offer quickly, try our DDP cost calculator.
The make-or-break issue: origin
A China+1 plant exists to make goods of Vietnamese or Cambodian origin. US customs knows that many of these plants still rely on Chinese inputs, so it looks hard at whether real manufacturing happens locally. Goods found to be Chinese in substance are dutied as Chinese, with penalties and possible evasion (EAPA) cases against the importer.
- US test: substantial transformation — the product must become a new article in Vietnam or Cambodia. Simple assembly, cutting or relabelling of Chinese parts often fails. See country of origin and substantial transformation.
- Vietnamese C/O Form B: generally LVC 30% or a change of tariff heading — useful evidence, but not the US test. See C/O Form B for the USA.
- Never use a warehouse to change origin. See bonded warehouses and transshipment risk.
- Name the real manufacturer on the invoice, C/O and ISF, and keep production records by lot.
We prepare C/Os in line with your bill of materials and flag borderline products before shipment: certificate of origin service.
Customs clearance at each step
| Step | Where | Key documents |
|---|---|---|
| Machinery import | Vietnam or Cambodia | Fixed-asset list or QIP approval, inspection certificate for used machines, B/L, invoice, packing list |
| Input import | Vietnam or Cambodia | Form E or Form D, contract, invoice, consumption norms for export production |
| Transit to Cambodia | Vietnamese port → Moc Bai–Bavet | Transit declaration, B/L showing Cambodia as final destination, sealed truck |
| Cross-border trade | Moc Bai–Bavet | Export and import declarations, Form D, invoice, packing list |
| Export | Vietnam or Cambodia | Export declaration, C/O, booking, VGM |
| US import | US port | ISF, entry and entry summary, bond, HTS classification, origin support |
Our customs team handles Vietnamese and Cambodian declarations directly; US entries go through licensed broker partners. See customs brokerage.
A 90-day logistics checklist for a new plant
- Days 1–30: confirm duty-exemption lists or QIP approval; check used-machinery rules; map every input supplier and its origin; choose ports and routings.
- Days 31–60: move machinery; set up bonded or transit flows for inputs; register on Vietnam's eCoSys system for C/Os; agree Incoterms with buyers.
- Days 61–90: run trial shipments end to end; test the C/O and origin file on a sample product; set up the importer of record for DDP buyers; fix delivery KPIs.
How Balance Trans supports China+1 manufacturers
From Ho Chi Minh City we connect the whole chain: project and machinery moves, inputs through Vietnamese ports, daily trucking between Vietnam and Cambodia with clearance on both sides, C/O preparation, and DDP delivery to the USA and Canada with a compliant importer of record. One team, one set of documents, one origin story that holds up. We work in English, Vietnamese and Chinese. Tell us about your plant.
FAQ
Is China+1 still worth it after the 2026 US tariff changes?
For many products, yes: Vietnamese and Cambodian goods face different US duty treatment from Chinese goods. The benefit only holds if the goods are genuinely of Vietnamese or Cambodian origin; check current rates in US tariffs on Vietnamese goods in 2026.
Can we keep buying materials from China?
Yes. Most China+1 plants do. What matters is that the processing in Vietnam or Cambodia is substantial enough to give the finished product local origin, and that your records prove it.
Should we set up in Vietnam or Cambodia?
It depends on the product, labour needs and market access. Many groups use both, linked by daily cross-border trucking and Vietnamese deep-sea ports.
Can Cambodian goods ship to the US through Vietnam?
Yes, as Cambodian-origin cargo, with documents showing Cambodia as the origin. See shipping from Cambodia to the USA.
Do you handle the US side?
Yes: ISF, entry and duty payment through licensed US broker partners, an importer of record for non-US sellers, and delivery to warehouses, 3PLs and Amazon FBA.
